Job Details
Post Name : Executive
No of Vacancy : 12 Posts
Pay Scale : Rs 54060/- (Per Month)
Post Name : Supervisor
No of Vacancy : 13 Posts
Pay Scale : Rs 26920/- (Per Month)
Educational Qualification :
For Executive : Full-Time Bachelor’s Degree in Engineering/Technology in Civil Engg.
OR 5 Year Integrated Master’s degree OR Dual Degree Programme in Engineering or Technology in Civil Engineering from recognised Indian University/Institute with minimum 60% marks in aggregate for General / OBC and 50% marks in aggregate for SC/ST candidates
For Supervisor : Full Time Diploma in Civil Engineering from a recognised Indian University/Institute with minimum 60% marks in aggregate for General / OBC and 50% marks in aggregate for SC/ST candidates
Age Limit : Maximum age limit is 37 years as on 01.
012018
Age Relaxation : for SC/ST Candidates 05 years & for OBC Candidates 03 years
Job Location : Haridwar (Uttarakhand)
Selection Process : Selection will be based on Written Test & Interview
Application Fee : Candidates have to pay Rs200/- through Demand Draft in favour of BHEL, PSSR payable at Chennai
How to Apply : Interested candidates may apply through the website www.
bhelpssrcoin from 03012018 to 17.
012018 & send the the acknowledge slip along with all relevant document & envelop superscribed “Application for the Post of __________” to the Addl General Manager(HR) BHEL, Power Sector Southern Region, 690, EVR Periyar Building, Anna Salai, Chennai-600035 on or before 08022018.
BHELs growth has been synchronous with achieving self-sufficiency in the indigenous manufacturing of heavy electrical equipment Out of the available 35,000 MW per annum capacity for power plant equipment manufacturing in the country, BHEL alone constitutes a mammoth 20,000 MW per annum capacity A widespread network of 17 Manufacturing Divisions, 2 Repair Units, 4 Regional Offices, 8 Service Centres, 4 Overseas Offices, 6 Joint Ventures, 15 Regional Marketing Centres and current project execution at more than 150 project sites across India and abroad corroborates the humungous scale and size of its operations
In FY 2016-17, the company commissioned/synchronized 8,539 MW of power generating equipment With this, the company’s global installed power generating capacity has gone up to 178 GW.
Notably, enhanced focus on project execution has resulted in BHEL achieving a capacity addition of 45,274 MW during the 12th Five Year Plan period (2012-17), surpassing the target of 41,661 MW set by the government for BHEL, by 9% With this, BHEL continues to remain the single largest contributor to the country’s power generation capacity addition