Job Details
Post Name : Trade Apprentice
No of Vacancy : 271 Posts
Pay Scale : Not Specified
Trade Wise Vacancy :
Electrician : 30 Posts
Fitter : 90 Posts
Machinist : 80 Posts
Welder : 27 Posts
Turner : 24 Posts
Foundry men : 09 Posts
Draftsman(Mechanic) : 03 Posts
Electronic(Mechanic) : 01 Post
Motor Mechanic Vehicle : 01 Post
Pattern Maker : 02 Posts
Forjer & Heat Treatment : 04 Posts
Educational Qualification : 10th Pass and ITI in related Trade
Age Limit : Minimum and Maximum age limit is 18 to 27 years as on 01042018
Job Location : Haridwar (Uttarakhand)
Selection Process : Selection will be based on Merit Basis / Interview.
Application Fee : There is no application fee
How to Apply : Interested candidates may apply through the website https://careersbhelhwrcoin from 14.
022018 to 23022018 & send the Acknowledgment Slip Along with Copies of Registration Number, Birth Certificate or 10th Marksheet, Qualification Certificates, ITI Certificate/Marksheet, Domicile Certificate, Adhar Card, Caste Certificate to Deputy General Manager, Room No 28, H R Department, Chief Administrative Building, BHEL, Heep, Ranipur, Haridwar (Uttarakhand) -249403 on or before 28.
022018
BHELs growth has been synchronous with achieving self-sufficiency in the indigenous manufacturing of heavy electrical equipment Out of the available 35,000 MW per annum capacity for power plant equipment manufacturing in the country, BHEL alone constitutes a mammoth 20,000 MW per annum capacity A widespread network of 17 Manufacturing Divisions, 2 Repair Units, 4 Regional Offices, 8 Service Centres, 4 Overseas Offices, 6 Joint Ventures, 15 Regional Marketing Centres and current project execution at more than 150 project sites across India and abroad corroborates the humungous scale and size of its operations.
In FY 2016-17, the company commissioned/synchronized 8,539 MW of power generating equipment With this, the company’s global installed power generating capacity has gone up to 178 GW Notably, enhanced focus on project execution has resulted in BHEL achieving a capacity addition of 45,274 MW during the 12th Five Year Plan period (2012-17), surpassing the target of 41,661 MW set by the government for BHEL, by 9% With this, BHEL continues to remain the single largest contributor to the country’s power generation capacity addition